Project: phowe   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Oct 02, 2023     Vertical Stabilizer Cap - (6 hours)       Category: Tail Feathers
I fished the wire for the tail position light up through the grommets in the stabilizer. I sanded the bottom of the fairing so that it cleared the rudder. I matched drilled the fairing to the stabilizer. I positioned and drilled the position light holder and then drilled a hole through the fairing and installed a grommet for the wire to power the light. I then riveted the faring rib to the vertical stabilizer. I needed to move the top grommet in the vertical stabilizer as the rib covered it.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.